![Tektronix 070-9176-00 Instruction Manual Download Page 26](http://html1.mh-extra.com/html/tektronix/070-9176-00/070-9176-00_instruction-manual_1077403026.webp)
Getting Started
P6467 High-Speed Probe Adapter Instruction Manual
11
4. For each module, use the 92A96 Channel menu to define the channel setups
and the data and clock threshold voltages. Set the clock threshold voltage to
VAR –1.85 V and the data threshold voltage to VAR +1.90 V.
5. For each module, use the Clock menu to define the clocking requirements. If
you setup the probe for use in the DIV2 operating mode, set the Clock menu
to External. Set up one module to clock on the rising edge of the clock
(with no qualification) and set up the second module to clock on the falling
edge of the same clock as the first module.
6. For each module, use the Trigger menu to define the data you want to
acquire and to assert and monitor the signals defined in the Cluster Setup
menu. Figure 8 shows an example of one of the Trigger menus (the Trigger
menu must be the same for both modules in the module pair with the
exception of the definition of the signals used between the two modules).
Figure 8: Sample Trigger Menu (First Module)
Summary of Contents for 070-9176-00
Page 5: ......
Page 13: ...Service Safety Summary viii P6467 High Speed Probe Adapter Instruction Manual ...
Page 39: ...Operating Basics 24 P6467 High Speed Probe Adapter Instruction Manual ...
Page 45: ...Reference 30 P6467 High Speed Probe Adapter Instruction Manual ...
Page 49: ...Specifications 34 P6467 High Speed Probe Adapter Instruction Manual ...
Page 51: ......
Page 65: ...Adjustment Procedures 50 P6467 High Speed Probe Adapter Instruction Manual ...
Page 77: ...Replacable Parts 62 P6467 High Speed Probe Adapter Instruction Manual ...
Page 81: ...Appendix B P6467 Test Board 66 P6467 High Speed Probe Adapter Instruction Manual ...
Page 84: ......