23
Diagram 128:
Buffer tank, heating circuit via pre-mixed district heating pipe,
switch-over valve hot water, heating requirement resp. feed pump
Sensors
Outputs
T1…. Buffer tank top
A1…. Heating circuit pump
T2…. Buffer tank bottom
A2…. 3-way valve hot water tank
T3…. Hot water tank
A3…. Mixer open
T4…. Heating circuit flow
A4…. Mixer close
T5…. Outdoor temperature
A5…. Burner requirement
T6…. Room sensor
Basic function (P128):
Heating circuit is supplied by pre-mixed district heating pipe. Heating
circuit pump
A1
runs for hot water requirement too; 3-way valve
A2
opens for hot water
requirement.
A1 = T1 > min1 & (heating = active) or A2 (hot water requirement)
A2 = T1 > min1 & T1 >T3 + diff1 & T3 < max
A5 on = T1 < min2
A5 off = T1 > min2 + diff2
A5 = burner
requirement
Required settings:
min1
…switch-on thresh. T1
A1,2 min2
…boiler requirement T1
A5
max
…limit hot water tank T3
A2
diff1
…buffer T1 – hot water tank T3
A2 diff2
… buffer T1 – min2
A5
V
max
, V
min,
T+20, T-20, T
norm
, T
abs,
mixer control parameter Mr
heating pump parameter HPu, time program,
A1 off A2 off
T1 < min1 T1 < min1
diff1
A1 on
A2 + A1 on
Switch-off cond. HPu T3 > max
A1 off
A2 off
Burner requirement
A5
ON
T1 < min2
OFF
T1 > min2 + diff2
Summary of Contents for HZR 65
Page 1: ...HZR 65 Version P5 6 7 EN Universal heating controller Operation Installation instructions en ...
Page 2: ......
Page 31: ...31 Schematic representation of setting values ...
Page 57: ......
Page 58: ......
Page 59: ......