22
Diagram 112:
Heat pump control and requirement, heating circuit pump, solar
collector, hot water tank
Sensors
Outputs
T1…. Collector
A1…. Heating circuit pump
T2…. Tank bottom
A2…. Solar pump
T3…. Tank top
A3…. Differential function
T4…. Heating circuit return
A4…. Hot water tank feed pump
T5…. Outdoor temperature
A5…. Heat pump requirement
T6…. Room sensor
Basic function (P112):
Heating circuit pump is switched on for set run time
tr
if: heating
active & return temperature
T4 < Vsoll
(nominal flow temperature depending on outdoor
temperature)
or
set cycle time
tc
is over)
When after run time
tr
the return temperature
T4 < Vsoll,
the heat pump is required by
A5
(condition: blocking time
tb
is over).
A1
and
A5
will be switched off, when
T4 > Vsoll + diff2
.
A1 = according to description above
A2 = (T1 > min1) & (T1 > T2 + diff1) & (T2 < max)
A3 = T1 > T3 + diff2
A4 = T3 < min2
A5 = T3 < min2 or heat pump requirement for heating
Program 113:
As program 112, but heating circuit pump is switched of when hot water
requirement occurs (hot water priority).
Required settings:
(Vsoll = nominal flow temperature)
min1
.... switch-on thresh. T1
A2 min2
... hot water requirement T3
A4,5
max
.... limit hot water tank T2
A2
diff1
.... coll. T1-tank T2
A2 diff2
.... switch-off thresh. return T4 - Vsoll
A5
V
max
, V
min,
T+20, T-20, T
norm
, T
abs,
heating pump parameter HPu, time program,
Additional settings in menu PnL
(ew
= factory settings “ex works”)
:
Tc
..... cycle time
setting range: 0 to 90 minutes (tc0 - tc9) ew: tc3 (30 minutes)
Tr
..... run time
setting range: 0 to 9 minutes (tr0 - tr9) ew: tr2 (2 minutes)
Tb
..... blocking time setting range: 0 - 90 minutes (tb0 - tb9) ew: tb3 (30 minutes)
A5 =
Heat pump
require-
ment
Summary of Contents for HZR 65
Page 1: ...HZR 65 Version P5 6 7 EN Universal heating controller Operation Installation instructions en ...
Page 2: ......
Page 31: ...31 Schematic representation of setting values ...
Page 57: ......
Page 58: ......
Page 59: ......