10
Diagram 32:
Automatic boiler, (combined) buffer, heating circuit, burner require-
ment
Sensors
Outputs
T1…. Boiler
A1…. Heating circuit pump
T2…. Tank top
A2…. Tank feed pump
T3…. Tank center
A3…. Mixer open
T4…. Heating circuit flow
A4…. Mixer close
T5…. Outdoor temperature
A5…. Burner requirement
T6…. Room sensor
Basic function (P32):
The combined tank is maintained at temperature. Tank feed pump
A2
;
mixer control
A3+A4
; burner requirement
A5
. Sensor
T1
is available for eventual speed
control function for boiler flow (
A2
).
A1 = T3 > min2 & (heating = active)
A2 = T1 > min1 & T1 > T3 + diff1
A5 = T2 < max or (T3 < Vsoll + diff2 & (heating = active))
Required settings:
min1
…switch-on thresh. T1
A2 min2
…switch-on thresh. T3
A1
min2
…additional used with programs 33, 34
max
…limit T2 (T3)
A5
diff1
…boiler T1 – tank c. T3
A2 diff2
… Vsoll – tank cent. T3
A5
V
max
, V
min,
T+20, T-20, T
norm
, T
abs,
mixer control parameter Mr
heating pump parameter HPu, time program
A1 off
A2 off
T3 < min2 T1 < min1
diff1
A1 on
A2
on
Switch-off cond.
HPu
T3
A1 off
Burner requirement
A5
T2 < max
or
heating active
and
T3 < Vsoll + diff2
(Vsoll = nominal flow temperature)
A5 = burner
requirement
Pellets-
or fossil
fuel
boiler
Summary of Contents for HZR 65
Page 1: ...HZR 65 Version P5 6 7 EN Universal heating controller Operation Installation instructions en ...
Page 2: ......
Page 31: ...31 Schematic representation of setting values ...
Page 57: ......
Page 58: ......
Page 59: ......