Operation & Maintenance Manual
CD-135 / CD-155
OM-02-02
Chapter:
Issue:
Issue date:
Page:
Content:
1
4
30.07.2014
8
10
Revision no.:
Revision date:
8
20.07.2016
0.2
List of applicable Chapters
signatures
Document No.
Document
Issue
Revision
Date
02-OM-00-02
Lists
4
8
20.07.2016
02-OM-01-02
Introduction
4
-
30.07.2014
02-OM-02-02
Description and Dimensions of
the Engine
4
-
30.07.2014
02-OM-03-02
Technical Data
4
2
06.06.2016
02-OM-04-02
Operation
4
2
02.09.2015
02-OM-05-02
Airworthiness Limitations
4
6
06.06.2016
02-OM-06-02
Maintenance Schedules
4
7
20.07.2016
02-OM-07-02
Emergency Procedures
4
-
30.07.2014
FOBL E8-01
Change of Hands
4
-
30.07.2014
FOBL E8-06
Inspection of the timing chain
1
-
20.07.2016
Checklist
Engine Maintenance Checklist
- After the 3rd - 6th operating
hour
4
-
17.04.2015
Checklist
Engine Maintenance Checklist
- General
4
5
20.07.2016
Prepared:
Checked:
Approved:
D. Dick
C. Rudolph, MPI
D. Hartung, MPL
The technical information contained in this document has been approved under
the authority of EASA Design Organisation Approval No. EASA.21J.010.
Technify Motors GmbH
Geschäftsführer: Carsten Rudolph, Jürgen Schwarz, Shan Tian
Amtsgericht Chemnitz HRB 28249 - USt. Ident.-Nr. DE 287721150