12
GNCRP / GNCRPE / GNCRPE 230 - Rev. 03 - Aug/22
2. To the operator
Lifting points
This equipment has adequate lifting points located on the frame. When lifting with a
hoist, it is essential to hitch the cables to all of these points.
- Only
CAPABLE
and
AUTHORIZED
personnel should carry out the equipment
movimentation.
- Note every condition of each PPE, such as the foot protection, safety glasses,
safety helmet, protective gloves and other PPE as required.
- Use chains, of at least 3 meters long, to lift the equipment safely.
- Use the adequate points for lifting and be sure that the equipment is safe. Avoid
accidents.
- Always isolate the area where the lifting and components movimentation will be
carried out. Always keep a safe distance from the equipment.
ATTENTION! RISK OF ACCIDENT
GNCRP- 32 and 36
GNCRP- 32 and 36
GNCRP- 64 to 72
GNCRP- 64 to 72
GNCRPE 230 - 28 to 72
GNCRPE 230 - 28 to 72
4 lifting points
4 lifting points
GNCRP - 40 to 60
GNCRP - 40 to 60
GNCRPE - 36 to 60
GNCRPE - 36 to 60
3 lifting points
3 lifting points