50
GNCRP / GNCRPE / GNCRPE 230 - Rev. 03 - Aug/22
In the gang assembly to the carriers, the bearing
hangers should remain facing the disc blades concavity.
5. Assembly
Assembly of the disc gangs on the frame
IMPORTANT
- The rear gang turns earth to the left and the front gang turns earth to the right.
For the DM bearings:
1. Place the bolt (A) and pass it through the bearing
housing (E) and through the bearing hanger hole
(D). On the upper part, place a square washer
(B), nut and counternut (C).
C
B
E
D
A
For the equipment models that have bearing
scrapers:
1. On the other bearing hanger (D) hole,
place a bolt (A) and pass it through the
bearing housing (E) and through the
bearing hanger hole; on the upper part,
place the scraper (F) and fasten using a
square washer (B) and nut (C).
2. Note the scrapers fixation position and
assemble them with their end facing the
disc blades concavity.
3. Repeat this operation on the other bearings.
- GNCRP: 32 to 60 disc blades
- GNCRPE: 36 to 60 disc blades
D
F