Contents
xiv
Operating and Programming Manual
Supplemental Characteristics ............................................ 113
Installation ....................................................... 117
Contents ........................................................... 118
Initial Inspection ................................................................. 119
Preparation for Use ............................................................ 120
Power Requirements .................................................................... 120
Selecting Line Voltage and Fuse .................................................. 121
AC Power Cabling ........................................................................ 122
Operating Environment ............................................................... 123
Bench Operation ........................................................................... 123
Installing Options 908 and 913 .................................................... 123
Returning the 5071A to Symmetricom .............................. 124
Operator’s Maintenance ..................................................... 126
Operating the 5071A From External DC Power ............... 126
Preparing the 5071A For External-DC Operation ...................... 127
Replacing the External DC Input Power Fuse ............................ 128
Internal Standby Battery Maintenance ............................. 129
Battery Shelf Life and Storage .................................................... 129
Battery Operating Temperatures ................................................ 129
Battery Charging .......................................................................... 130
Battery Disposal ........................................................................... 131
Removing and Replacing the Internal Battery ............................ 132
Cesium Beam Tube Replacement ...................................... 133
Long-Term Storage ............................................................. 133
Performance Tests ....................................... 135
Introduction ........................................................................ 136
Operational Verification ............................................................... 136
Complete Performance Tests ....................................................... 136
RS-232 Verification ...................................................................... 136
Test Record ......................................................................... 136
Equipment Required .......................................................... 137
5071A Operational Verification ......................................... 140
Power-On Self-Tests and Servo Lock ........................................... 140
Rear-Panel Output Signal Checks ..................................... 142
Required Equipment .................................................................... 142
Summary of Contents for 5071A
Page 2: ......
Page 28: ...Preface xxvi Operating and Programming Manual ...
Page 29: ...____________________________________________ Chapter 1 Getting Started Getting Started ...
Page 32: ...Chapter 1 Getting Started The 5071A at a Glance 4 Operating and Programming Manual ...
Page 33: ...Chapter 1 Getting Started The 5071A at a Glance Operating and Programming Manual 5 ...
Page 40: ...Chapter 1 Getting Started Performing Basic Tasks 12 Operating and Programming Manual ...
Page 41: ...____________________________________________ Chapter 2 Using the 5071A Using the 5071A ...
Page 97: ...____________________________________________ Chapter 5 Command Reference Command Reference ...
Page 119: ...Chapter 5 Command Reference Description of SCPI Commands Operating and Programming Manual 91 ...
Page 136: ...Chapter 5 Command Reference Error Messages Codes 108 Operating and Programming Manual ...
Page 137: ...____________________________________________ Chapter 6 Specifications Specifications ...
Page 145: ...____________________________________________ Chapter 7 Installation Installation ...
Page 162: ...Chapter 7 Installation Cesium Beam Tube Replacement 134 Operating and Programming Manual ...
Page 186: ...Appendix A Performance Tests 5071A PERFORMANCE TEST 158 Operating and Programming Manual ...
Page 187: ...____________________________________________ Appendix B Glossary Glossary ...
Page 190: ...Appendix B Glossary 5071A Glossary 162 Operating and Programming Manual ...