Chapter 5 Command Reference
Status Reporting
100
Operating and Programming Manual
Table 5-4. IEEE Standard Event Status Register (ESR)
Bit
Function Name
0
OPC IEEE Operation complete
1
RQC (not used)
2
SCPI Query error
3
SCPI Device Dependent Error
4
SCPI Execution Error
5
SCPI Command Error
6
URQ (not used)
7
PON Power On flag
Table 5-5. SCPI OPERation Status Register
Bit
Function Name
Bit Status
0
CALibrating
Set when performing auto calibration
1
SETTling
always zero
2
RANGing
always zero
3
SWEeping
always zero
4
MEASuring
always zero
5
awaiting TRIG
always zero
6
awaiting ARM
always zero
7
CORRecting
always zero
8
Standby
Set when in standby state
9
On Battery
Set when power source is internal
battery (this will always be 0 for 48V
option instruments).
10
Normal
Set when operating normally
11
Fatal
Set when in fatal error state
12
Steered
Set when output frequency is being
steered
13
INST summary
always zero
14
PROG running
always zero
15
Unused
always zero
Summary of Contents for 5071A
Page 2: ......
Page 28: ...Preface xxvi Operating and Programming Manual ...
Page 29: ...____________________________________________ Chapter 1 Getting Started Getting Started ...
Page 32: ...Chapter 1 Getting Started The 5071A at a Glance 4 Operating and Programming Manual ...
Page 33: ...Chapter 1 Getting Started The 5071A at a Glance Operating and Programming Manual 5 ...
Page 40: ...Chapter 1 Getting Started Performing Basic Tasks 12 Operating and Programming Manual ...
Page 41: ...____________________________________________ Chapter 2 Using the 5071A Using the 5071A ...
Page 97: ...____________________________________________ Chapter 5 Command Reference Command Reference ...
Page 119: ...Chapter 5 Command Reference Description of SCPI Commands Operating and Programming Manual 91 ...
Page 136: ...Chapter 5 Command Reference Error Messages Codes 108 Operating and Programming Manual ...
Page 137: ...____________________________________________ Chapter 6 Specifications Specifications ...
Page 145: ...____________________________________________ Chapter 7 Installation Installation ...
Page 162: ...Chapter 7 Installation Cesium Beam Tube Replacement 134 Operating and Programming Manual ...
Page 186: ...Appendix A Performance Tests 5071A PERFORMANCE TEST 158 Operating and Programming Manual ...
Page 187: ...____________________________________________ Appendix B Glossary Glossary ...
Page 190: ...Appendix B Glossary 5071A Glossary 162 Operating and Programming Manual ...