This list describes the components of the drawing.
Description
Number
Captive screw that connects the appliance to the rack.
1
Blue peg that connects the rail bottom to the rack.
2
Empty (no screws or pegs).
3
Silver peg that connects the rail top to the rack.
4
The silver peg is on the top of each rail. The blue peg is on the bottom of each rail.
The blue peg and the square silver peg snap into the rack without screws or cage
nuts.
To install the rack rails
1
Identify the one RU on each side of the rack where you plan to install the
rails.
2
Verify that there is one complete RU available under the RU used for rail
installation.
Installing hardware into racks
Installing the NetBackup appliance guide rails
34
Summary of Contents for NetBackup 5230
Page 1: ...Symantec NetBackup 5230 Appliance Hardware Installation Guide Release 2 6 1 2 21350324 ...
Page 16: ...Introduction Product documentation 16 ...
Page 22: ...Installation requirements Prerequisites for IPMI configuration 22 ...
Page 28: ...Preparing for hardware installation Checking the shipping packages 28 ...
Page 60: ...V validation appliance 44 NetBackup 5230 hardware checks 43 storage shelf 44 Index 60 ...