55
The CAN-ID 1 is automatically assigned to
the master. This means the slave can be
assigned the IDs from 2 to 99.
Commissioning cannot be continued until
an ID has been requested from the main
unit.
2. Completion of commissioning
Confirm overview with
.
3. Carry out commissioning for all other
slaves as described above.
Later commissioning
If you add new unit or replace existing
ones in your solar system, then you can
display the unit list in the display on the
main unit under «Settings – Network
– CAN bus». The new unit can them be
put into operation in accordance with
the description for commissioning sec-
ondary units.
Summary of Contents for AT 2700
Page 1: ...User Manual for Sunways Solar Inverter AT 5000 AT 4500 AT 3600 AT 2700...
Page 8: ...1 0 Product Description...
Page 16: ...16 2 0 Safety precautions...
Page 22: ...22 3 0 Installation...
Page 46: ...46 4 0 Commissioning...
Page 56: ...56 5 0 Operation...
Page 96: ...96 6 0 System monitoring...
Page 129: ...129...
Page 130: ...130 7 0 Appendix...
Page 135: ...135 Efficiency of AT 5000 Output power W...
Page 136: ...136 Efficiency of AT 4500 Output power W...
Page 137: ...137 Efficiency of AT 3600 Output power W...
Page 138: ...138 Efficiency of AT 2700 Output power W...
Page 140: ......
Page 141: ...C F Werbung und Dokumentation Villingen Schwenningen www cundf de...