52
2. Select language in selection menu
with
/
.
Confirm selected language with
.
3. Select entry «Master» in selection
menu with
/
.
Confirm with
.
The other units in the CAN network are
automatically configured as slaves.
Commissioning several networked units
Before commissioning, all units must be
interconnected via the CAN bus interface.
See the chapter Networking solar invert-
ers via CAN bus.
Switch on all units following installation.
Commissioning begins with the main unit
you have selected.
Commissioning main unit
1. During initial start-up the following
appears on the display:
Start commissioning of main unit with
.
Summary of Contents for AT 2700
Page 1: ...User Manual for Sunways Solar Inverter AT 5000 AT 4500 AT 3600 AT 2700...
Page 8: ...1 0 Product Description...
Page 16: ...16 2 0 Safety precautions...
Page 22: ...22 3 0 Installation...
Page 46: ...46 4 0 Commissioning...
Page 56: ...56 5 0 Operation...
Page 96: ...96 6 0 System monitoring...
Page 129: ...129...
Page 130: ...130 7 0 Appendix...
Page 135: ...135 Efficiency of AT 5000 Output power W...
Page 136: ...136 Efficiency of AT 4500 Output power W...
Page 137: ...137 Efficiency of AT 3600 Output power W...
Page 138: ...138 Efficiency of AT 2700 Output power W...
Page 140: ......
Page 141: ...C F Werbung und Dokumentation Villingen Schwenningen www cundf de...