Depending on the grid operator and
the feed point, a three-phase meter or a
single-phase meter must be used.
Some grid operators require the use of a
reverse-current-capable meter.
A basic distinction is made between two
different connection options of the solar
inverter to the public power grid:
· 3-phase AC grid
(e.g. Germany)
· 1-phase AC grid (e.g. Italy, Spain)
!
CAUTION
Observe the regional regulations for the
grid connection.
In Germany the grid connection must
always be 3-phase!
The solar inverter always only feeds via
AC terminal 2. If several solar inverters
are operated in parallel in a 3-phase grid,
AC terminal 2 of the unit must be distrib-
uted uniformly among the grid phases
L1, L2 and L3 to avoid unequal loading.
Summary of Contents for AT 2700
Page 1: ...User Manual for Sunways Solar Inverter AT 5000 AT 4500 AT 3600 AT 2700...
Page 8: ...1 0 Product Description...
Page 16: ...16 2 0 Safety precautions...
Page 22: ...22 3 0 Installation...
Page 46: ...46 4 0 Commissioning...
Page 56: ...56 5 0 Operation...
Page 96: ...96 6 0 System monitoring...
Page 129: ...129...
Page 130: ...130 7 0 Appendix...
Page 135: ...135 Efficiency of AT 5000 Output power W...
Page 136: ...136 Efficiency of AT 4500 Output power W...
Page 137: ...137 Efficiency of AT 3600 Output power W...
Page 138: ...138 Efficiency of AT 2700 Output power W...
Page 140: ......
Page 141: ...C F Werbung und Dokumentation Villingen Schwenningen www cundf de...