50
3. Select entry «Single device» in selec-
tion menu with
/
.
Confirm with
.
4. Set date and time.
Please note that time settings should only
be made with caution, as they directly af-
fect data logging. For example, if you set
the time back by 1 hour, then the existing
data will be overwritten.
Select time with
. Change selected
number with
/
and jump to next
number with
/
.
Commissioning single unit
1. During initial start-up the following
appears on the display:
Start commissioning with
.
2. Select language in selection menu
with
/
.
Confirm selected language with
.
Summary of Contents for AT 2700
Page 1: ...User Manual for Sunways Solar Inverter AT 5000 AT 4500 AT 3600 AT 2700...
Page 8: ...1 0 Product Description...
Page 16: ...16 2 0 Safety precautions...
Page 22: ...22 3 0 Installation...
Page 46: ...46 4 0 Commissioning...
Page 56: ...56 5 0 Operation...
Page 96: ...96 6 0 System monitoring...
Page 129: ...129...
Page 130: ...130 7 0 Appendix...
Page 135: ...135 Efficiency of AT 5000 Output power W...
Page 136: ...136 Efficiency of AT 4500 Output power W...
Page 137: ...137 Efficiency of AT 3600 Output power W...
Page 138: ...138 Efficiency of AT 2700 Output power W...
Page 140: ......
Page 141: ...C F Werbung und Dokumentation Villingen Schwenningen www cundf de...