47
–
The string serial communication box EMU200 requires an external power supply of
220 Vac, so a power supply port and an input port (including switches) should be re-
served in the LV power distribution room of the boost transformer.
5.6.2 Requirements for OT/DT Terminal
OT/DT terminals (not included in the delivery scope) are required for fixing AC cables to the
terminal block. Purchase the OT/DT terminals according to the following requirements.
OT/DT Terminals of Phase Wire (One Wire per Phase with Multi-core Cable)
•
Specification: M12
OT/DT Terminals of Phase Wire (Two Wires per Phase with Multi-core Cable)
•
Specification: M12
User Manual
Summary of Contents for SG285HX
Page 2: ......
Page 6: ......
Page 10: ......
Page 44: ...34 step 5 Use bolts to secure the pegboard to the U beam End 4 Mechanical Mounting User Manual...
Page 128: ...www sungrowpower com Sungrow Power Supply Co Ltd...