26
step 4 Remove the lifting rings and reassemble the sealing screws released in Step 1.
Keep the inverter balanced throughout the hoisting process and avoid collisions
with walls or other objects. Stop hoisting in the event of severe weather, such as
heavy rain, thick fog, or strong wind.
The lifting rings and the sling are not within the delivery scope.
- - End
4.5
Installing the mounting-bracket
The inverter can be installed on a bracket, a wall, and a pole by means of mounting-bracket.
Dimensions of the assembled mounting-bracket are as follows.
User Manual
Summary of Contents for SG285HX
Page 2: ......
Page 6: ......
Page 10: ......
Page 44: ...34 step 5 Use bolts to secure the pegboard to the U beam End 4 Mechanical Mounting User Manual...
Page 128: ...www sungrowpower com Sungrow Power Supply Co Ltd...