71
step 2 Press the snap on both sides of the connector to remove the on-site making of wire parts.
step 3 Select a seal according to the cable outer diameter. Lead the cable through the swivel nut,
seal and on-site making of wire parts.
step 4 Strip the cable of appropriate lengths of protective and insulating layers.
User Manual
Summary of Contents for SG285HX
Page 2: ......
Page 6: ......
Page 10: ......
Page 44: ...34 step 5 Use bolts to secure the pegboard to the U beam End 4 Mechanical Mounting User Manual...
Page 128: ...www sungrowpower com Sungrow Power Supply Co Ltd...