10. Using a 3/8” socket, remove both
hex nuts
(P/N 0015-004-000) (AL) and both
flat
washers
(P/N 0011-512-000) (AK).
11. Remove the
docker isolation transformer
(P/N 0702-014-520) (AM) and set aside.
Note:
Once the
docker isolation transformer
(P/N 0702-014-520) (AM), is
reinstalled, the proper electrical safety tests must be performed before placing
docking station back in service. Follow procedure
6.5 Testing
to make sure the
proper testing requirements are met.
4-18
Summary of Contents for 0702-002-620
Page 1: ......
Page 3: ......
Page 5: ......
Page 15: ......
Page 17: ......
Page 19: ......
Page 21: ......
Page 22: ...Chapter 1 Operational Description...
Page 23: ......
Page 27: ......
Page 28: ...Chapter 2 Ultra Rover Disassembly...
Page 29: ......
Page 31: ...4 Remove front cover assembly P N 0702 001 070 CH and place aside 2 2...
Page 37: ...4 Remove front cover assembly P N 0702 001 070 CH and place aside 2 8...
Page 42: ...4 Remove front cover assembly P N 0702 001 070 CH and place aside 2 13...
Page 49: ...4 Remove front cover assembly P N 0702 001 070 CH and place aside 2 20...
Page 81: ...4 Remove front cover assembly P N 0702 001 070 CH and place aside 2 52...
Page 103: ......
Page 105: ......
Page 106: ...Chapter 4 Docker Disassembly...
Page 107: ......
Page 133: ......
Page 134: ...Chapter 5 Troubleshooting...
Page 135: ......
Page 167: ......
Page 168: ...6 33 Chapter 6 Technical Procedures...
Page 169: ......
Page 219: ......
Page 220: ...Chapter 7 Installation...
Page 221: ......
Page 224: ...7 3...
Page 228: ...Chapter 8 Appendices...
Page 229: ......
Page 231: ......