4. Using a 1/8” allen wrench remove four
socket flat countersunk head cap screws
(P/N
0004-346-000) (L) and separate the
actuator strike plate
(P/N 0702-014-111) (B) by
lifting it upwards.
Caution:
the
extended hall sensor
(P/N 0702-014-119) (H), the
rover hall sensor
(P/N
0702-014-106) (E), the
hall sensor
(P/N 0702-014-906) (J), and the
docker power coupler
assembly
(P/N 0702-014-114) (F) are all mounted to the strike plate. Each component has
a wiring harness attached to it. Be careful not to get the connectors caught on anything
when the removing the
actuator strike plate
(P/N 0702-014-111) (B).
5. Using a 1/8” allen wrench, remove two
socket flat countersunk head cap screws
(P/N 0004-346-000) (L).
6. Remove the
docker power coupler assembly
(P/N 0702-014-114) (F) and set aside.
4-7
Summary of Contents for 0702-002-620
Page 1: ......
Page 3: ......
Page 5: ......
Page 15: ......
Page 17: ......
Page 19: ......
Page 21: ......
Page 22: ...Chapter 1 Operational Description...
Page 23: ......
Page 27: ......
Page 28: ...Chapter 2 Ultra Rover Disassembly...
Page 29: ......
Page 31: ...4 Remove front cover assembly P N 0702 001 070 CH and place aside 2 2...
Page 37: ...4 Remove front cover assembly P N 0702 001 070 CH and place aside 2 8...
Page 42: ...4 Remove front cover assembly P N 0702 001 070 CH and place aside 2 13...
Page 49: ...4 Remove front cover assembly P N 0702 001 070 CH and place aside 2 20...
Page 81: ...4 Remove front cover assembly P N 0702 001 070 CH and place aside 2 52...
Page 103: ......
Page 105: ......
Page 106: ...Chapter 4 Docker Disassembly...
Page 107: ......
Page 133: ......
Page 134: ...Chapter 5 Troubleshooting...
Page 135: ......
Page 167: ......
Page 168: ...6 33 Chapter 6 Technical Procedures...
Page 169: ......
Page 219: ......
Page 220: ...Chapter 7 Installation...
Page 221: ......
Page 224: ...7 3...
Page 228: ...Chapter 8 Appendices...
Page 229: ......
Page 231: ......