S-CB
+
Boiler Range Manual
16
5.2 Mounting the boiler
Before mounting and installing the boiler the following connections should be considered:
Flue gas system and the flue gas pipe connections
Air supply system and connections
Flow and return pipe connection
Condensate and pressure relief valve drainage
Power supply (preferably the power connection positioned above the boiler)
All lines/piping must be mounted free of tension. The weight of the installation components should be sup-
ported separately from the boiler so there will be no standing forces on the connections.
This might influence the mounting position of the boiler.
Determine the position of the flow and return pipes by using the included suspension bracket or a suspension
frame (when supplied).
While marking the holes, ensure that the suspension bracket or frame is perpendicular and the boiler does not lean
forward. If necessary adjust the position with the adjusting bolts at the lower rear side of the back panel (see draw-
ing). When the adjusting bolts ar
en’t sufficient, fill the gap behind the bolts to get the boiler in position. The exact
boiler position lies between the boiler hanging level and hanging slightly backwards.
The boiler should not lean forward in the mounted position.
Lock the suspension bracket with the security cover before making any other connections to the boiler. This secu-
rity cover will prevent the boiler from falling off the bracket. Don't use excessive force during the mounting of the
boiler connections.
suspension detail
1
. Attach mounting bracket to wall
with inclined side facing upwards
3
. Lock boiler with locking plate
and two bolts
2
. Suspend boiler with suspension
bracket on mounting bracket
4
. Level boiler using
adjusting bolts
Summary of Contents for S-CB+ Series
Page 2: ......
Page 3: ......
Page 22: ...S CB Boiler Range Manual 22 ...
Page 39: ...S CB Boiler Range Manual 39 9 4Electrical schematics ...
Page 124: ...S CB Boiler Range Manual 124 ...