Measures to be implemented before
shutdown
–
Store the truck in a dry, clean, frost-free and
well-ventilated environment.
–
Clean the truck thoroughly; see the chapter
entitled "Cleaning".
–
Lift the fork carriage to the stop several
times.
–
Tilt the lift mast forwards and backwards
several times and move the attachment re-
peatedly, if an attachment is fitted.
–
To relieve the strain on the load chains,
lower the fork onto a suitable supporting
surface, e.g. a pallet.
–
Check the hydraulic oil level and top up if
required.
–
Apply a thin layer of oil or grease to all un-
coated moving parts.
–
Lubricate the truck.
–
Oil joints and controls.
–
Lubricate the battery cover interlock.
–
Ensure that the key switch is switched off.
Then disconnect the battery male connec-
tor.
–
Check the battery condition, acid level and
acid density.
–
Service the battery.
–
Spray all exposed electrical contacts with a
suitable contact spray.
–
Only have the truck raised and jacked up by
the authorised service centre.
–
Cover the truck with vapour-permeable ma-
terial, such as cotton, in order to protect the
truck against dust.
–
If the truck will be shut down for longer peri-
ods, contact the authorised service centre
to find out about additional courses of ac-
tion.
Operating
4
Decommissioning
322
56358042501 EN - - 11
Summary of Contents for RX60-60
Page 2: ......
Page 13: ...1 Foreword ...
Page 20: ...Overview Foreword 1 Your truck 8 56358042501 EN 11 ...
Page 41: ...2 Safety ...
Page 70: ...Safety 2 Emissions 58 56358042501 EN 11 ...
Page 71: ...3 Overviews ...
Page 83: ...4 Operating ...
Page 336: ...Operating 4 Decommissioning 324 56358042501 EN 11 ...
Page 337: ...5 Maintenance ...
Page 344: ...Maintenance 5 General maintenance information 332 56358042501 EN 11 ...
Page 381: ...6 1000 hour maintenance annual mainte nance ...
Page 385: ...7 Technical data ...
Page 398: ...Technical data 7 Fuse assignment 386 56358042501 EN 11 ...
Page 407: ......
Page 408: ...STILL GmbH 56358042501 EN 11 ...