Maintenance
6
Maintenance every 2000 hours
– Consult our service department to carry out
this work.
1044_606-012
Checking and cleaning the battery
WARNING
Risk of short circuit and even explosion.
Do not smoke, keep away from naked flames and
do not place metal objects on the battery.
Servicing the battery according to
the manufacturer’s instructions
WARNING
Risk of personal injury due to arcing!
– Do not reverse the battery poles or cause a short.
Insulation resistance check (earth-
ing)
The insulation of industrial trucks should have
sufficient insulation resistance. Test the truck
and battery separately.
Testing the insulation resistance of the
electrical system
Have the insulation resistance of all active
electrical components checked in accordance
with DIN 57117 and DIN 43539, VDE 0117
and VDE 0520.
Measurement voltage > nominal voltage <
500 V. Insulation is considered correct when
50108043033 [EN]
141
Summary of Contents for KANVAN-05
Page 2: ......
Page 8: ...Table of contents g 7 Technical data Datasheet VDI 146 Wheels and tyres 149 VI 50108043033 EN ...
Page 9: ...1 Foreword ...
Page 18: ...1 Foreword Environmental considerations 10 50108043033 EN ...
Page 19: ...2 Introduction ...
Page 32: ...2 Introduction Residual risks 24 50108043033 EN ...
Page 33: ...3 Safety ...
Page 49: ...4 Overview ...
Page 65: ...5 Operation ...
Page 121: ...6 Maintenance ...
Page 139: ...Maintenance 6 Maintenance as required 1050_003 028 F5 F3 F1 F4 F8 50108043033 EN 131 ...
Page 140: ...6 Maintenance Maintenance as required 132 50108043033 EN ...
Page 152: ...6 Maintenance Maintenance every 5000 hours 144 50108043033 EN ...
Page 153: ...7 Technical data ...
Page 158: ...7 Technical data Wheels and tyres 150 50108043033 EN ...
Page 162: ......
Page 163: ......
Page 164: ...STILL GmbH Berzeliusstrasse 10 D 22113 Hamburg Ident no 50108043033 EN ...