SB--7--622 Page 16
FIGURE 14
FIGURE 15
If backlash is above the specified lim-
it, the gears are not necessarily unus-
able. Excessive play could be caused
by worn bearings.
5.
If timing gears appear to be reusable, matchmark
timing gear toothmesh by making small punch
marks on the ends of meshing gear teeth with a
pin punch and hammer (see FIGURE 13, page
15). The impeller tip to valley (throat) and the case
to headplates should also be match marked to fa-
cilitate blower reassembly.
6.
Remove each timing hub (39) and the timing gear
(9) as a complete assembly with a gear puller.
(See FIGURE 14). Do not remove timing bolts
(38) or threaded taper pins (36), unless the gears
or hubs will be replaced.
If replacing the timing gears (9), re-
move the timing hub taper pins (36) by
placing washers or an oversized nut
over the extending threaded area of
the pin. Tighten a proper--sized nut
on the pin and it will eject.
7.
Remove the four socket head cap screws (30)
from the drive end bearing cover (29) and remove
FIGURE 16
the cover. Drive shaft oil seal (31) should come
free when cover is removed.
8. Remove mounting foot (17) from the drive head-
plate (24) by removing the capscrews (16).
9. Remove the capscrews (21) which secure the
drive headplate (24) to the impeller case (22).
10. Using the fabricated puller plate shown on page
11, bolt to the drive headplate using the tapped
holes used to secure the drive cover.
11. Install a gear puller to each shaft and attach the
puller arms to the fabricated plate. Turn each pull-
er only half a revolution at a time keeping the ad-
vance of the shafts as uniform as possible (see
Summary of Contents for TANVAC HDV3000
Page 2: ...1300 998 784 STGGLOBAL NET OPERATORS MANUAL TANVAC HDV3000 Sec on 1 ...
Page 11: ...8 4 COMPONENT IDENTIFICATION Engine Control Panel Control Panel ...
Page 14: ...11 Water System Water pump Switch Water Pump ...
Page 15: ...12 Water Strainer Hose Reel ...
Page 16: ...13 Water Tank Drain Valve Lever Vacuum System Dump valve Suction Valve ...
Page 17: ...14 Blower Vacuum ...
Page 19: ...16 Primary Shutoff Assembly Collection Tank Interior Bag House Lid ...
Page 20: ...17 Bag House Drain Valve Tools Water Gun ...
Page 34: ...31 20 3000lt ELECTRIC CONTROL BOX CIRCUIT DIAGRAM 1 ...
Page 35: ...32 21 3000lt ELECTRIC CONTROL BOX CIRCUIT DIAGRAM 2 ...
Page 36: ...33 22 3000lt VACUUM UNIT BOTTOM RAIL ASSEMBLE ...
Page 37: ...1300 998 784 STGGLOBAL NET OPERATORS MANUAL Cat 2 2 Opera on Manual Sec on 2 ...
Page 137: ... Table 32 contd 100 SEBU8312 03 Reference Information Section Maintenance Log ...
Page 141: ......
Page 144: ...1300 998 784 STGGLOBAL NET OPERATORS MANUAL Comet Manual Sec on 3 ...
Page 161: ...1300 998 784 STGGLOBAL NET OPERATORS MANUAL Sutorbilt R Series Sec on 4 ...
Page 200: ...SB 7 632 Page 39 SECTION 8 PARTS LIST ...
Page 202: ...SB 7 632 Page 41 ...
Page 204: ...SB 7 632 Page 43 301GAE810 A Ref Drawing ...
Page 206: ...SB 7 632 Page 45 ...
Page 208: ...SB 7 632 Page 47 ...
Page 210: ...SB 7 632 Page 49 303GAE810 A Ref Drawing ...
Page 212: ...SB 7 632 Page 51 ...
Page 214: ...SB 7 632 Page 53 ...
Page 216: ...SB 7 632 Page 55 300GAE810 A Ref Drawing ...
Page 218: ...SB 7 632 Page 57 ...
Page 220: ...SB 7 632 Page 59 ...
Page 222: ...SB 7 632 Page 61 302GAA810 A Ref Drawing ...
Page 224: ...SB 7 623 Page 63 ...
Page 226: ...1300 998 784 STGGLOBAL NET OPERATORS MANUAL Sutorbilt P Series Sec on 5 ...
Page 245: ...SB 7 622 Page 12 1 PIPE STEEL 2 SCH 80 2 MED CARBON STEEL 1 2 FIGURE 9 GEAR DRIVER SK2150 ...
Page 258: ...SB 7 622 Page 25 SECTION 8 PARTS LIST 300GAF810 B Ref Drawing ...
Page 260: ...SB 7 622 Page 27 300GAG810 A Ref Drawing ...
Page 262: ...SB 7 622 Page 29 300GAH810 A Ref Drawing ...
Page 265: ......
Page 266: ...1300 998 784 STGGLOBAL NET OPERATORS MANUAL Lofa Manual Sec on 6 ...
Page 294: ...1300 998 784 STGGLOBAL NET OPERATORS MANUAL Excava on Hydro SWMS Sec on 7 ...
Page 314: ...1300 998 784 STGGLOBAL NET OPERATORS MANUAL Pressure Cleaner Water SWMS Sec on 8 ...