Chapter 2
Preparing to Install the Server
2-5
FIGURE 2-1
Power Cords With a Redundant PSU Connection
For a dual-power feed connection, connect each power cord separately to each AC
power supply system.
FIGURE 2-2
Power Cords With a Dual-Power Feed Connection
PSU#1 PSU#0
CB
AC power supply
CB
CB: Circuit breaker
PSU#1 PSU#0
CB: Circuit breaker
CB
CB
AC power supply
Summary of Contents for Enterprise M3000
Page 4: ......
Page 8: ...viii SPARC Enterprise M3000 Server Installation Guide March 2012 ...
Page 34: ...3 14 SPARC Enterprise M3000 Server Installation Guide March 2012 ...
Page 42: ...4 8 SPARC Enterprise M3000 Server Installation Guide March 2012 ...
Page 60: ...B 10 SPARC Enterprise M3000 Server Installation Guide March 2012 ...