1-2
SPARC Enterprise M3000 Server Installation Guide • March 2012
From the operator panel, power on the server. Confirm the configuration and
operation with the dual power feed option.
Section 3.5, “Powering On the Server” on page 3-10
Connect additional peripheral devices.
Section 3.6, “Connecting Additional Peripheral Devices” on page 3-13
Test environment
creation and
confirmation of
operation
Connect the Gigabit Ethernet port (GbE port) and the user network.
Section 4.2, “Connecting to the Network” on page 4-2
Confirm the network connection.
Section 4.3, “Verifying the Network Connection” on page 4-3
Start the Oracle Solaris operating system.
Section 4.4, “Starting the Oracle Solaris Operating System” on page 4-3
Start Oracle VTS, and confirm hardware operation.
Section 4.5, “Verifying Operation by Running Oracle VTS” on page 4-4
From this point, begin to do the setup required for system operation.
Refer to the
SPARC Enterprise M3000/M4000/M5000/M8000/M9000 Servers
Administration Guide
.
TABLE 1-1
Installation Workflow
(Continued)
Installation Stage
Workflow Task
Summary of Contents for Enterprise M3000
Page 4: ......
Page 8: ...viii SPARC Enterprise M3000 Server Installation Guide March 2012 ...
Page 34: ...3 14 SPARC Enterprise M3000 Server Installation Guide March 2012 ...
Page 42: ...4 8 SPARC Enterprise M3000 Server Installation Guide March 2012 ...
Page 60: ...B 10 SPARC Enterprise M3000 Server Installation Guide March 2012 ...