![Spacelabs Healthcare elance 5 Service Manual Download Page 53](http://html1.mh-extra.com/html/spacelabs-healthcare/elance-5/elance-5_service-manual_1339020053.webp)
Maintenance
Replacing the Recorder Side PCBA
1.
Disconnect battery power by moving the rear switch to off position.
2.
Remove the Front Panel.
3.
Remove the Main Board and Zbitsy Board from the rear enclosure.
4.
Remove the CO
2
PCBA if installed.
5.
Remove two screws from the middle that hold the Recorder Side PCBA to rear enclosure.
6.
Remove the recorder Side PCBA.
7.
Replace the Side Board and reassemble the monitor in reverse order.
4-30
Remove Screw
Remove Screw
Connect to Main board
Alarm LED connector
Summary of Contents for elance 5
Page 1: ...Vital Signs Monitor 93300 05 Service Manual 070 1949 00 Rev H...
Page 7: ...Introduction External Recorder 1 4...
Page 77: ...Glossary The following terms may appear in this manual 7 1...
Page 78: ...Glossary 7 2...
Page 79: ...Glossary 7 3...
Page 85: ...Appendix B Symbols B 2...
Page 86: ...Appendix B Symbols B 3...
Page 87: ...Appendix B Symbols B 4...
Page 88: ...Appendix B Symbols B 5...
Page 89: ...Appendix B Symbols B 6...
Page 90: ...Appendix B Symbols B 7...
Page 91: ...Appendix B Symbols B 8...
Page 92: ...Appendix B Symbols B 9...
Page 94: ...Appendix B Symbols lance is a registered trademark of Spacelabs Healthcare B 11...