4-26
DSR-300/P(E)/V1
7. Attach the GL (T) assembly to the attaching
shaft.
Note:
Adjust the protrusion of the GL (S)
assembly to the V groove of the GL
(T) assembly as shown in the figure,
and attach the threading gear so that
the phase mark of the threading gear
and teeth A next to part B match.
8. Attach rail (T) first from the claw and then the
attaching shaft, and tighten the screw.
.
Tightening torque: 0.0588 N
.
m (0.6 kg
.
cm)
9. Attach the capstan motor and drum assembly in
the reverse order of steps 1 and 2.
Check/Adjustment
10. Perform the capstan FG DUTY adjustment at
Menu M601. (Refer to Section 8-1.)
11. Perform tape path check. (Refer to Section 5-3.)
12. Perform tracking adjustment.
(Refer to Sections 5-4 to 5-7.)
13. Perform the switching position adjustment at
Menu M605. (Refer to Section 5-8.)
Teeth A
GL (S) assembly
GL (T) assembly
Protrusion
Part B
V groove
Phase mark
Threading gear
Screw
Rail (T)
Claw