9)
Drill the gate leaf reinforcement.
10)
Mount the bracket.
11)
Put the gate arm back into position.
12)
Check that the position of the brack-
et on the gate is correct by manually opening the gate.
If necessary, correct the position.
6. INSTALLING THE INTEGRATED OPENING
END STOP
1)
Manually open the gate to the opened position
Į
required.
α
max
2)
Install the end stop on the brack-
et side, flush against the shoulder of the motor arm.
Do not tighten the end stop.
3)
Close the gate slightly.
4)
Move the end stop approximately 2 mm towards the motor arm shoul-
der.
2mm
5)
Tighten the end stop with a long Allen key for greater torque when
tightening the end stop bolts (16 Nm).
A
B
C
D
E
F
6)
Install the end stop covers: screw the lower cover (with holes) (22b),
holding the sha while performing this operation, then screw in the
upper cover (22a).
22a
22b
2
1
7)
Permanently secure the gate leaf bracket using the central mounting
hole.
7
Copyright© 2017 SOMFY ACTIVITES SA. All rights reserved.
EN
Axovia 220B RTS