5.3. Connecting AC Output Cable
Connect PV inverter to the AC Junction Unit with AC output wires and ground wire as shown in the following
steps:
1.
Do not use cables where losses will exceed 1%
L1(phase1), L2(phase 2), L3(phase3), N(neutron), PE(hearth ground): wires gauge 4/6 mm
2
PE(hearth ground): wires gauge 10mm
2
2.
Remove the rubber plug from inside of the AC connector socket
3.
Insert all AC wires through AC cover kit in following order before cramped with insulated
cord end terminal:
cable gland
rubber bushing
AC cover
cord end terminal
4.
Connect the AC wires to the AC terminal block correspondingly and tighten it properly.
PE2 wire area must be of same gauge as PE1 does (or 10 mm
2
).
5.
Add an insulated cord end terminal to each AC wire before connecting. The stripped length of AC wire is
about 10 mm to 12 mm.
Summary of Contents for SUNSYS - B10
Page 1: ...SUNSYS B10 Installation and Operation Manual ...
Page 15: ...15 D Check and ensure the device is properly fixed to the bracket in the proper direction ...
Page 36: ...36 ...
Page 37: ...37 ...
Page 38: ...38 ...
Page 39: ...39 ...
Page 40: ...40 ...
Page 41: ...41 ...
Page 42: ...42 ...
Page 54: ...54 ...