24
At the bottom of the page, if the parameter are all ok, selec
t “YES” and press “OK” key for 5s to accept.
6.2. Automatic start
The PV inverter starts automatically when the DC power from the photovoltaic field is sufficient to run only after
the initial startup.
Regulation Parameter
FH D BACK : 50.10Hz
FL D BACK : 49.90Hz
Freq L1 : Disable
Power Reduction:2.4%
Power VS Freq : Enable
Reconnection T : 300s
Yes No
Green backlight
Summary of Contents for SUNSYS - B10
Page 1: ...SUNSYS B10 Installation and Operation Manual ...
Page 15: ...15 D Check and ensure the device is properly fixed to the bracket in the proper direction ...
Page 36: ...36 ...
Page 37: ...37 ...
Page 38: ...38 ...
Page 39: ...39 ...
Page 40: ...40 ...
Page 41: ...41 ...
Page 42: ...42 ...
Page 54: ...54 ...