13
Please be sure the installation rules listed below are followed.
1.
Select a wall or solid vertical surface that can support the PV inverter in the long run.
2.
PV inverter requires adequate cooling space. Allow at least 30cm space above and 90cm space below
the Inverter.
3.
For maintenance purpose, please keep Inverter 30cm distance at least from each other.
Note:
Don’t mount PV inverter on top of another one or other heat radiating sources unless it is inevitable, in
that case, 100cm spacing at minimum from each other is required to provide proper ventilation effect.
A. Fix the Bracket by using all of six mounting holes, the bracket should be fixed with M5*30mm screws
by 30kgf-cm (or 2.94 N-m ) torque force, as illustrated below:
*Notes: Diameter for the safety screw is at 10mm.
B. PV inverter will be able to lift up with the proper lifting tool in order to move PV inverter to the installed
Summary of Contents for SUNSYS - B10
Page 1: ...SUNSYS B10 Installation and Operation Manual ...
Page 15: ...15 D Check and ensure the device is properly fixed to the bracket in the proper direction ...
Page 36: ...36 ...
Page 37: ...37 ...
Page 38: ...38 ...
Page 39: ...39 ...
Page 40: ...40 ...
Page 41: ...41 ...
Page 42: ...42 ...
Page 54: ...54 ...