Chapter 5 Maintenance
SS2400T/S
5-7
5.3.2 ARRANGEMENT
OF
INSTRUMENTS IN THE SWITCHBOARD
TL1
G1
G2
F1, F2
K1
F3, F4, F5
SM1
X3
TL2
Fig.5.3
Arrangement of Instruments in the Switchboard
5.3.3 CONTROL
Barfeeder control is ensured by PLC PP35 (hereinafter only PLC) integrated in the barfeeder
control panel, which controls the SM1 drive and power elements of the X3 module in the
barfeeder switchboard.
ENC/A
ENC/B
AX2
AX1
APWR
RS232C
BAT
1
SW1, SW0
I/O
LED
PLC (A)
Fig.5.4 Control
5.3.3.1 PLC
PLC Element
Description
AX1 DI
AX2
AI, AO, DO
APWR PLC
power
supply
BAT Standby
battery
SW1, SW0
Machine configuration
I/O
LED meaning selection
LED
Green – DI state; Yellow – DO state
Summary of Contents for SPACESAVER 2400S
Page 2: ......
Page 8: ...Table of Contents 8 SS2400T S...
Page 17: ...Chapter 1 Description SS2400T S 1 7...
Page 18: ......
Page 75: ...Chapter 5 Maintenance SS2400T S 5 13 5 3 6 WIRING DIAGRAMS...
Page 76: ...Chapter 5 Maintenance 5 14 SS2400T S...
Page 77: ...Chapter 5 Maintenance SS2400T S 5 15...
Page 78: ...Chapter 5 Maintenance 5 16 SS2400T S...
Page 79: ...Chapter 5 Maintenance SS2400T S 5 17...
Page 80: ...Chapter 5 Maintenance 5 18 SS2400T S...
Page 81: ...Chapter 5 Maintenance SS2400T S 5 19...
Page 82: ...Chapter 5 Maintenance 5 20 SS2400T S...
Page 83: ...Chapter 5 Maintenance SS2400T S 5 21...