HRX-OM-M005
Chapter 3 Transporting and Installation
HRZD Series
3.2 Installation
3-5
3.2.2
Installation location and maintenance work area
The product does not have any ventilating hole on the right and left sides. Although it can be
installed directly contacting walls or other devices, installation with maintenance space is
recommended. (See “Figure 3-2)
Figure 3-2 Recommended Installation Location
To save space, the product can be installed to allow access only in front and back for daily operation
and inspection. For maintenance and repair work, additional access space is required for the left and
right side of the product. We recommend a separate repair area, without taking space from
installation site, to accommodate the needed extra space.
Figure 3-3 Installation Location
Daily inspection area
Operation area
Front
Front
800mm
800mm
800mm
800mm
Summary of Contents for HRZD020-W1S-W1S
Page 24: ...HRX OM M005 Chapter 2 Name of Each Section 2 1 Name of Each Section HRZD Series 2 2 ...
Page 98: ...HRX OM M005 Chapter 5 Product Operation 5 3 Operation Screen HRZD Series 5 54 ...
Page 128: ...HRX OM M005 Chapter 8 Appendix 8 8 Thermo Chiller Daily Inspection Sheet HRZD Series 8 20 ...