HRX-OM- T002
Chapter 8 Control, Inspection and Cleaning
8.4
Operation Stop for an Extended Period of Time
HRS090 Series
8-10
8.4.2
Discharge of the facility water (Water-cooled type)
1.
Shut off the breaker of the customer
’s power supply.
2.
Stop supplying the facility water and make sure there is no pressure in the facility water
piping.
3.
Remove the facility water piping from the product.
4.
Open the Left side panel then, open the air vent valve. The facility water in the product
will be drained from the facility water inlet port.
Fig. 8-6 Discharge of the facility water
After draining, shut the air vent valve and close the Left side panel.
Before discharding the facility water, stop operation of the user
’s
equipment and release the residual pressure.
Facility water inlet
A view
A
Air vent valve
Facility water outlet