![SKF IPM 12 Operating Instructions Manual Download Page 67](http://html1.mh-extra.com/html/skf/ipm-12/ipm-12_operating-instructions-manual_1287095067.webp)
Page 67
EN
Attention!
Pay attention to the respectively valid
national environmental and legal regu-
lations when dismantling and disposing
of the display and programming units!
5.2 IPM 12 pulse meter
5.2.1 IPM 12 housing installation
5. Installation/connection
The following points must be observed when
installing the components of the VARIOLUB
monitoring system:
Good visibility of the display
Possibility to make later changes in the
settings
Possibility to make later changes in the
connections
Sufficient room for removal of the cover
Compliance with characteristics - see the
chapter on Technical Data
When removing the cover, make sure
the cover screws cannot fall out.
5.1 Dismantling and disposal
7x Pg11
Pg11
connector
mobil PGA3
4x Ø4,3
88
120
188
200
93
28
5. Installation/connection
16
88
120
6
1
8
8
2
0
0
4,3
Summary of Contents for IPM 12
Page 47: ...Seite 47 DE...
Page 51: ...Seite 51 DE 11 4 COMO Zentralschmiersystem berwachung 11 Anschlussbeispiele Men struktur...
Page 53: ...Seite 53 DE...
Page 101: ...Page 101 EN...
Page 105: ...Page 105 EN 11 4 Overview COMO Lube System Monitoring 11 Connection example menu structure...
Page 107: ...Page 107 EN...