Instruction Manual StackGuard
12
10266E/1
3.4
Installation of the cooling section
Pos. Name
1
Connection hose (950 mm)
between cooling section outlet
and purge air filter
2
Cooling section outlet
3
Cooling section (consisting of
two aluminum tubes)
4
Connection hose (40 mm)
5
Three tube clamps
6
Cooling section inlet
7
Connection hose (450 mm)
between cooling section inlet
and purge air blower
8
Purge air blower
9
Purge air filter
Figure 10: Cooling section installation example
Action Remarks
1.
Fix the tube clamps (5) to the desired posi-
tion on the wall as shown in the figure.
2.
Connect the two aluminum tubes (3) with
the 40 mm long hose piece (4).
Place the entire unit into the prefixed tube
clamps (5).
→
3.
Fasten the 950 mm long hose section (1)
to the cooling section outlet (2).
Attach the other end of the hose onto the
purge air filter (9).
→