51/232
Building Technologies
Boiler sequence controller RMK770
CE1P3132en
HVAC Products
3 Commissioning
23.04.2009
K5.3
31
32
S
33
N.X3
N.X6
N.X1
N.X2
N.Q3
N.Q6
N.Q2
N.Q1
N.Q4
A9.Q1
A9.Q4
A9.Q2
N.Q5
A9.Q3
M
M
K6.1
31
32
S
34
N.X3
N.X6
N.X1
N.X2
N.X4
N.X7
N.Q1
N.Q4
A9.Q1
A9.Q2
A9.Q3
A9.Q4
N.Q2
N.Q5
K6.2
31
32
S
35
N.X3
N.X6
N.X1
N.X2
N.X4
N.X7
N.Q1
N.Q4
A9.Q1
A9.Q2
A9.Q3
A9.Q4
N.Q2
N.Q6
N.Q3
N.Q5
1. 2.
1. 2.
K6.3
31
32
S
36
N.X3
N.X6
N.X1
N.X2
N.X4
N.X7
N.Q1
N.Q4
N.Q2
A9.Q3
A9.Q4
A9(2).Q3
A9(2).Q4
A9.Q1
A9(2).Q2
A9.Q2
N.Q5
A9(2).Q1
Explanation of the terminal markings used:
Boiler with 1-stage burner
1. 2.
Boiler with 2-stage burner
Boiler with modulating burner, 3-position
N
Connection terminal on the controller
X1
Configurable input at the controller
Q1
Relay with terminals Q11, Q12 and Q14
Q2
Relay with terminals Q23 and Q24
A7
Connection terminals on the RZM787 extension module
A9
Connection terminals on the first RZM789 extension module
A9(2) Connection terminals on the second RZM789 extension module