Advanced commissioning
7.8 Application-specific functions
Converter with control units CU250D-2
Operating Instructions, 04/2015, FW V4.7.3, A5E34261542B AB
239
4.
Select process variables of the technology controller
5.
Adapting to the line supply
6. Save your settings.
7. Go online.
The inverter signals that offline,
other units and process variables
are set than in the inverter itself.
8. Accept these settings in the in-
verter.
You have changed over the units.