Commissioning
4.5 Commissioning with STARTER
Frequency inverter
Operating Instructions, 08.10. 2008, t.b.d.
69
●
The Project Wizard for the (first) commissioning is concluded with the following summary:
Figure 4-15 Completing commissioning
●
Finally, choose "Finish".