Commissioning and Diagnostics
5-11
ET 200X Distributed I/O Device
EWA 4NEB 780601602-06
Commissioning the DP slave
Table 5-6
Order of steps for commissioning the DP slave
Step
Procedure
1.
Turn on the supply voltage to the DP slave.
2.
Turn on the supply voltage to the load as necessary.
Starting up the ET 200X
The ”BF” LED goes out; inputs
and outputs are enabled;
Data transfer between the
ET 200X and the DP master is
possible.
Supply voltage to the
ET 200X electronics/sensors
Supply voltage to the
ET 200X electronics/sensors
Yes
No
ET 200X sets outputs to ”0”
and applies set PROFIBUS ad-
dress
ET 200X receives configuration
data from DP master
Does configuration
data agree with real in-
stallation?
Match configuration data to
configuration or vice versa
The ”ON” and ”BF” LEDs
come on
SF red
BF flashing red
Figure 5-4
Start-up of the ET 200X
Summary of Contents for SIMATIC ET 200X
Page 8: ...Preface viii ET 200X Distributed I O Device EWA 4NEB 780601602 06 ...
Page 20: ...Contents xx ET 200X Distributed I O Device EWA 4NEB 780601602 06 ...
Page 40: ...Product Overview 1 20 ET 200X Distributed I O Device EWA 4NEB 780601602 06 ...
Page 58: ...Configuration Options 2 18 ET 200X Distributed I O Device EWA 4NEB 780601602 06 ...
Page 80: ...Installation 3 22 ET 200X Distributed I O Device EWA 4NEB 780601602 06 ...
Page 124: ...Configuration Options 2 18 ET 200X Distributed I O Device EWA 4NEB 780601602 06 ...
Page 328: ...Order Numbers A 10 ET 200X Distributed I O Device EWA 4NEB 780601602 06 ...
Page 348: ...Dimesioned Drawings and Pinouts C 18 ET 200X Distributed I O Device EWA 4NEB 780601602 06 ...
Page 362: ...Index Index 8 ET 200X Distributed I O Device EWA 4NEB 780601602 06 ...