16 Appendix
06.96 08.96 01.97 5. 97 10.97 04.98 10.99 10.01 4.02 02.03 04.04 08.05 04.06 03.07
VdS monitored control line
VdS extinguishing interface
Programmable control and indicating
panel faults
Free programmable control pattern
Message functions
Alarm delay
Fault delay
Prealarm time
2-detector dependency
2-detector zone dependency
Alarm buffering
ALORG
Branch algorithms
Additional parameter for
SIGMAPLUS
Detector parametes switchable
SIGMAPLUS / S-LINE
ASA Technology for S-LINE detec-
tors
Zentralenfunktionen
BMT/IMT mixed operation in
SIGMANET
BMT/IMT mixed operation in
SIGMASYS control and indicating
panel
SCI dialog operation
SCI open listening operation
SIGMAPORT third-party computer
connection
Time synchronisation
Virtual input and outputs
6 options for SIGMASYS M modules
8 objects per control and indicating
panel
D100 Stage 3 coupling S-Modul
SIGMASYS C without operating
panel
SIGMASYS C Sinteso control and in-
dicating panel FDnet
SIGMANET
Max. 8 control and indicating panels
in the NET and operating panels
Max. 32 units in the NET
NET parameterisation
SM88 SIGMALINK coupling
Spur control and indicating panels
with PLAN D100 V5.2
Protection against failure
Auto. responsibility transfer in the
event of an operating panel fault
116 / 128
BMT Project Planning Guidelines
Best.Nr. A24205-A337-B970 – Edition 12 (03/07)
Summary of Contents for SIGMASYS C
Page 4: ......
Page 30: ......
Page 38: ......
Page 44: ...6 Functions 36 128 BMT Project Planning Guidelines Best Nr A24205 A337 B970 Edition 12 03 07 ...
Page 48: ......
Page 62: ......
Page 84: ......
Page 110: ......
Page 128: ...16 Appendix 120 128 BMT Project Planning Guidelines Best Nr A24205 A337 B970 Edition 12 03 07 ...
Page 130: ......
Page 132: ......
Page 134: ......
Page 137: ......