8 Transponders and loop elements
46 / 128
BMT Project Planning Guidelines
Best.Nr. A24205-A337-B970 – Edition 12 (03/07)
•
Control of local plant facilities with feedback
d)
t
mens Cerberus series:
DF 119x, S 2406,A 2400, DLO 1191,
•
Maximum line data:
150
Ω
•
Monitoring current
A
etectors
rb diode
er
ompatible with threshold detectors with alarm resistance which meet the following
etectors in a line
< 3.2 mA
mA
reset
600
Ω
larm:
rb
diode
er
•
Maximum line data
ontact inputs:
tance
3k3
rable
•
General earth fault monitoring (can be disable
•
In-/outputs are electrically isolated from the FDne
Collective monitored line:
Compatible with following Sie
MS 6 (with LED), MS 7, MS 9, SIGMACON, DS1100,
FDOOT 241-9, FDF 221-9, FDF 241-9, FDL 241-9 and similar, as well as manual call points
with 680 ohm alarm resistance.
1µF
4.5 m
•
Maximum current on all d
3.2 mA
•
Terminal on automatic detectors:
Transzo
20 V ±5%
1.5 kW pulse pow
C
conditions (e.g. Synova 300):
•
Max. rest current on all d
•
Pulse current on alarm event
approx. 80
•
Reset voltage
< 1 V
•
Reset time
< 3 s
•
Settling time after
< 10 s
• Alarm
status:
410
Ω
…
•
Voltage in event of a
4 V … 14 V
•
Alarm holding current:
< 10 mA
•
Monitoring current
17 mA
• Terminal
Transzo
20 V ±5%
1.5 kW pulse pow
150
Ω
1 µF
C
• Rest
resis
• Signal
resistance:
560
Ω
• Inverse
monitoring:
configu
•
Maximum line data
150
Ω
1 µF
Summary of Contents for SIGMASYS C
Page 4: ......
Page 30: ......
Page 38: ......
Page 44: ...6 Functions 36 128 BMT Project Planning Guidelines Best Nr A24205 A337 B970 Edition 12 03 07 ...
Page 48: ......
Page 62: ......
Page 84: ......
Page 110: ......
Page 128: ...16 Appendix 120 128 BMT Project Planning Guidelines Best Nr A24205 A337 B970 Edition 12 03 07 ...
Page 130: ......
Page 132: ......
Page 134: ......
Page 137: ......