1 Introduction
SBT FSP DE
http://sgs.siemens.de/asp/FSP-Intranet/index.asp
1.2.3
Training courses
The personnel responsible for installing and commissioning the systems will receive all the in-
formation they need in special training courses.
These training courses are offered in the SBT DE Training Center.
You will find information on training courses on the Siemens Intranet under the following ad-
dress:
https://intranet.sbt.siemens.de/page.asp?nid=622
1.3
Notational conventions
Convention/symbol
Explanation
1. Operating
step
Operating instructions are indicated by numbers.
•
List
Lists are indicated by a bullet.
Important information
Important information is displayed in bold.
http://www.siemens.de
Text which you must enter yourself, (e. g. Internet addresses), is formatted in
the font ‘Courier New’.
Note
Notes or recommendations are indicated by this symbol and shown on a col-
ored background.
Warning
Information which you absolutely must read is indicated by this symbol and
shown on a colored background.
See section XY
Section references and links are indicated by this symbol and shown on a col-
ored background.
4 / 128
BMT Project Planning Guidelines
Best.Nr. A24205-A337-B970 – Edition 12 (03/07)
Summary of Contents for SIGMASYS C
Page 4: ......
Page 30: ......
Page 38: ......
Page 44: ...6 Functions 36 128 BMT Project Planning Guidelines Best Nr A24205 A337 B970 Edition 12 03 07 ...
Page 48: ......
Page 62: ......
Page 84: ......
Page 110: ......
Page 128: ...16 Appendix 120 128 BMT Project Planning Guidelines Best Nr A24205 A337 B970 Edition 12 03 07 ...
Page 130: ......
Page 132: ......
Page 134: ......
Page 137: ......