4 Project planning for control and indicating panels
Multifunctional Danger Control and Indicating Panels SIGMASYS C and M (M-Modules)
9 / 128
Best.Nr. A24205-A337-B970 – Edition 12 (03/07)
4
4
4
Project planning for control and indicating panels
Programming limitations at control and indicating panels ................................... 11
SIGMASYS control and indicating panel: installation dimensions....................... 13
SIGMASYS C control and indicating panel assignment...................................... 16
SIGMASYS M control and indicating panel assignment ..................................... 18
Assigning option slots in the SIGMASYS M ........................................................ 19
SIGMANET P coupler (from mid-2006)............................................................... 21
Summary of Contents for SIGMASYS C
Page 4: ......
Page 30: ......
Page 38: ......
Page 44: ...6 Functions 36 128 BMT Project Planning Guidelines Best Nr A24205 A337 B970 Edition 12 03 07 ...
Page 48: ......
Page 62: ......
Page 84: ......
Page 110: ......
Page 128: ...16 Appendix 120 128 BMT Project Planning Guidelines Best Nr A24205 A337 B970 Edition 12 03 07 ...
Page 130: ......
Page 132: ......
Page 134: ......
Page 137: ......