
PAC3120 and PAC3220
Equipment Manual, 10/2019,
L1V30425208F-01
55
Commissioning
5
5.1
Overview
Prerequisites
1. The device has been installed.
2. The device has been connected in accordance with the possible connection methods.
3. PAC3120: The RS485 interface has been connected to the bus.
PAC3220: The Ethernet cable has been connected.
Note: Optional for commissioning with powerconfig.
Steps for starting up the device
1. Connect the supply voltage.
2. Parameterize the device.
3. Connect the measuring voltage.
4. Connect the measuring current.
5. Check the displayed measured values.
6. Check the polarity and the phase assignment of the instrument transformers.
Note
Check the connections
Incorrect connection can result in malfunctions and failure of the device.
Before starting up the power monitoring device, check that all connections are correct.
Summary of Contents for SENTRON PAC3120
Page 1: ...PAC3120 and PAC3220 ...
Page 2: ......
Page 8: ...Table of contents 6 PAC3120 and PAC3220 Equipment Manual 10 2019 L1V30425208F 01 ...
Page 110: ...Technical data 10 2 Labeling 108 PAC3120 and PAC3220 Equipment Manual 10 2019 L1V30425208F 01 ...
Page 159: ......
Page 160: ......