5
Mounting
5.1
Safety
WARNING
Risk of injury through improper assembly work
All assembly work must be carried out only by authorized persons who, based on their
training and knowledge as well as knowledge of the relevant regulations, can assess
the tasks given and recognize the hazards involved.
CAUTION
Accident risk through inadequate fastening of the device
b
Consider the device weight specifications when planning the fitting supports.
b
Check the load capacity/condition of the duct on which the device is to be instal‐
led.
NOTICE
Damage to device and plant through unsecured parts during installation
During installation, parts of the device or flange can fall into the duct and cause
damage.
b
Secure all parts with wire.
NOTICE
Damage to the measuring device due to premature installation on the stack
Unsuitable ambient conditions in the measuring duct can damage the measuring
device and make commissioning impossible.
b
First install the measuring device on the stack after commissioning.
5.2
Preparing the measuring point
Responsibility of the operator
•
Determining the measuring point (e.g. determining a representative sampling
point)
•
Preparing the measuring point (e.g. load capacity of welded-on flange)
NOTICE
Basis for determining the measuring point:
•
Preceding project planning
•
Final inspection specifications for device
•
Regulations of local authorities
5.3
Checking the scope of delivery
b
Check the scope of delivery according to the order confirmation/delivery note.
b
Ensure the supply voltages indicated on the type plates correspond to the system
conditions.
b
Check all components for externally perfect delivery condition.
5
MOUNTING
24
O P E R A T I N G I N S T R U C T I O N S | GM901-02