6.3.1 About the Machine
Model SN Manufacture date
Voltage
Ф
V Frequency Hz Power kW
6.3.2 Installation & Inspection
Check if the pipe are connected correctly
Check if the pipe has any leakage
Check if the sealed joint has any crack
Electrical Component Installation
Voltage: V Hz
Fuse melt current: 1 Phase A 3 Phase A
Power phase sequence check
6.3.3 Daily Checking
Check the function of switches.
Check all wires of the machine.
6.3.4 Weekly Check
Check if the joint point is loose.
6.3.5 Monthly Check
Check the function of timer.