31(44)
4.2 Panel Instruction (SCAD-12U and Models Above)
Picture 4-2
:
Operation Panel (SCAD-12U and Models Above)
There are three control switches, a temp. controller, a timer on the control panel.
The three switches function as timing, loading, and drying respectively:
The operation steps for operating the hot air drying combination:
1) Connect to the 230V single phase power supply, and connect to the air
source (the air pressure must be 4-6kgf/cm
2
). After confirmation that the
breaker in the electric control box is closed, then start up the timing switch.
The 24 hours timer works as a timing start/stop switch (omit this timer, if it
doesn't need timing startup). When open the materials feeding switch, high
pressure air will feed the materials automatically. The capacitance proximity
switch in the drum will control the material level. When open the dry switch,
the hot air will dry the materials. During drying, EGO protector and
exceeding temperature alarm will work.
2) When need to stop the machine, first turn off the loading switch to stop the
loading work, then turn off the drying switch and the heaters stop
Summary of Contents for SCAD-12U
Page 1: ...SCAD U Series Compressed Air Dryer Date Jul 2014 Version Ver B English ...
Page 2: ......
Page 6: ...6 44 ...
Page 12: ...12 44 Picture 1 2 Outline Drawing SCAD 12U and Models Above ...
Page 41: ...41 44 6 Repair and Maintenance SCAD 6U and Models Below ...