43(44)
6.1 Filter & Pressure Regulating Valve
6.1.1 Filter & Pressure Regulating Valve Drawing
Parts list:
1. Pressure adjusting knob 2. Pressure gauge 3. Cup
4. Water outlet
Picture 6-1
:
Filter & Pressure Regulating Valve Drawing
6.1.2 Filter & Pressure Regulating Valve Operation steps
1) Switch on the air source.
2) Pull the black pressure adjusting knob 1 upward and rotate it, observe the
pressure gauge 2, generally a 0.5 Mpa pressure is advisable.
3) Push back the black knob 1.
6.2 Filter
Clean the filter periodically , usually one time for a week
;
Steps
:
1) Take out filter.
2) Use compressed air to clean the lid and filter.
3) Use cloth to wipe out the empty internal face of the filter.
4) Install in opposite order after cleaning.
Caution: Do not let any scrap fall into the hopper when take the filter out.
6.3 Maintenance Schedule
Summary of Contents for SCAD-12U
Page 1: ...SCAD U Series Compressed Air Dryer Date Jul 2014 Version Ver B English ...
Page 2: ......
Page 6: ...6 44 ...
Page 12: ...12 44 Picture 1 2 Outline Drawing SCAD 12U and Models Above ...
Page 41: ...41 44 6 Repair and Maintenance SCAD 6U and Models Below ...