28(44)
3.
Installation and Debugging
3.1 Attentions during Installation
1) Make sure that voltage of electricity matches with the nameplate.
2) Connect the electricity wire and earth wire according to local regulations.
3) Use independent electricity wire and power switch .The diameter of the wire
should not be less than that of electric cabinet
’
s wire.
4) The end of the electricity wire should be safe and firm.
5) Three-phase electricity and five wires are utilized. Connect the power to live
wire, (N) to zero wire and (G) to ground wire.
6) Electric Power distribution demand.
Main power voltage
:
±
5%
Main power frequency
:
±
2%
7) Install pipe work system according to scheme of wiring.
3.2 Installation Structure Demonstration
Picture 3-1
:
Installation Structure Demonstration
Summary of Contents for SCAD-12U
Page 1: ...SCAD U Series Compressed Air Dryer Date Jul 2014 Version Ver B English ...
Page 2: ......
Page 6: ...6 44 ...
Page 12: ...12 44 Picture 1 2 Outline Drawing SCAD 12U and Models Above ...
Page 41: ...41 44 6 Repair and Maintenance SCAD 6U and Models Below ...